The state of construction of the modern housing district of "Manhattan" 23.11.2018.
House №1.  
The plastering of the walls of the 13th floor has been completed. Works are completed on plastering the walls of the ground floor.
 
House №2.
The masonry of interior and exterior walls of the 11th floor is completed.
The masonry of the internal and external walls of the ground floor is completed.
The masonry of internal and external walls of 12th floor continues.                                                                               
 
House №3.
The masonry of ventilation ducts on the 2d,3d and the 4th floor has been completed.
Finished masonry of the 2nd and 3rd floor of the exterior and interior walls.Building of 2,3th floor of external and internal walls is completed. The masonry  of 2,3d floor of external and internal walls is completed.                                            
 
House №4.   The installation of walls of the staircase of the 2nd floor is completed. Conclusion of the concrete mixture in the walls and columns of the 2nd floor has been completed.The installation of the  concrete mixture is completed in the flag of ceiling of the 2d floor.
The laying of a concrete mixture in a floor slab of the 2 nd floor has been completed. The laying of a concrete mixture in a floor slab of the 2 nd floor has been completed. The laying of a concrete mixture in a floor slab of the 2 nd floor has been complete.                        
 
House №5.
Vertical waterproofing of the walls of the ground floor is completed.
The backfill of the walls of the ground floor has been completed.
The placement of the slab ceiling of the ground floor continues.
 
Transformer substation.
The roof is completed on the transformer substation.